The LifeTown Renderings Are Coming to Life
The LifeTown renderings are coming to life as the construction gets to the “fun part.” Day-by-day the dream is becoming a reality:
– The zero-entry pool is ready for the concrete.
– The multipurpose room, gym and therapy room walls are up.
– The ball pit, tumble track and cheese pit are ready in the indoor therapeutic park.
– The floor is in place over the entry level.
– Air Group has delivered and installed all the rooftop units.
– Electrical, plumbing and air systems are being installed.
Stop by to see the construction progress. Please join us for one of the upcoming hard-hat tours. RSVP to toba@fcnj.com.
• Sunday, September 10 – 4:00pm
• Wednesday, September 13 – 7:00pm
• Sunday , September 17 – 9:30am
Thank you to the teams from Hollister Construction Services, Rotwein+Blake Associated Architects PA, Avison Young and Cloudberry Studio for their hard work and dedication!