Posted by FCNJ - Friendship Circle on Friday, June 30, 2017

Raising the Roof on LifeTown

Work continues throughout LifeTown with the new roof structure being constructed. As the summer heats up the ducts for the air system are being hung and the 5 skylights in Life Village have been installed. The underpinning for the lower level is complete and the new drain pipes are being installed. The main entrance is also starting to take shape.

Posted by FCNJ – Friendship Circle on Friday, June 30, 2017

Posted by FCNJ – Friendship Circle on Friday, June 30, 2017

Day by day, week by week, LifeTown is coming to life...Time lapse video of the shower floor being poured.For more information on the LifeTown campaign or to follow the updates visit www.LifeTown.com.

Posted by FCNJ - Friendship Circle on Thursday, June 29, 2017

Day by day, week by week, LifeTown is coming to life…

Time lapse video of the shower floor being poured.

FC Staff Lifetown Tour

Posted by FCNJ - Friendship Circle on Monday, June 12, 2017

Site work begins at LifeTown

Construction at LifeTown is heating up on many fronts. Site work has begun with the (former) upper parking lot becoming a great outdoor ballfield and the new driveway entrances being cleared. The foundation for the elevator and main entrance are going in and the footings are being poured for the lower level. The roof is being prepped for the solar panels (yes, LifeTown will be 100% energy independent!) and the air systems.